Suggested Episode Plan
This document breaks the phases of PHASES.md into a series of suggested episodes. It is a plan, not a queue: episodes are dispatched by copying 01-episode-template.md into the next free number and filling in EPISODE-TASKS and EPISODE-OUTPUT at dispatch time (see prompts/how-to-write-episodes.md §7).
Rules the plan follows:
- One episode, one goal, one acceptance, reviewable in one sitting.
- Every acceptance criterion is a question.
- Riskiest assumption first in
EPISODE-RISKS. - Episode numbering is assigned at dispatch (branch
llm/episode-<n>). Here the episodes are named by phase and letter, so the plan survives renumbering.
Phase order is a dependency: a phase’s episodes are dispatched only after the previous phase’s milestone is met. Within a phase, the human may reorder the episodes.
Phase 1 —
Episode 1-A —
EPISODE-PHASE
phase 1
EPISODE-GOAL
<The single goal, in one or two sentences.>
EPISODE-ACCEPTANCE
- <Checkable criterion, phrased as a question>?
- <Checkable criterion, phrased as a question>?
EPISODE-RISKS
- <The riskiest assumption, phrased as a question>?
- <The next assumption, phrased as a question>?
EPISODE-TASKS
. .
EPISODE-FILES
<path>— new<path>— existing
Phase 2 —
Episode 2-A —
EPISODE-PHASE
phase 2
EPISODE-GOAL
<The single goal, in one or two sentences.>
EPISODE-ACCEPTANCE
- <Checkable criterion, phrased as a question>?
EPISODE-RISKS
- <The riskiest assumption, phrased as a question>?
EPISODE-TASKS
.
EPISODE-FILES
<path>— new